Abnormal costs on school construction

Typical abnormal-cost categories on UK school schemes (asbestos, RAAC, contaminated land, demolitions, plant relocation) with £ ranges and when to raise the 5% default allowance.

What counts as an abnormal

Abnormal costs are works above and beyond what the BCIS rate assumes , anything specific to your site that wouldn't feature on a notional new-build plot. The default allowance in this calculator is 5% of works; on confirmed-RAAC or asbestos-heavy sites, raise it.

Typical ranges

How abnormals are treated under CIF vs SRP

CIF[CIF] expects abnormals to be evidenced by a condition survey and itemised in the business case; the 10% fee cap applies to the works total including reasonable abnormals. SRP[SRP] absorbs RAAC and other condition-driven abnormals into the standard scheme cost when the project is delivered via the standard design. NAO January 2025[NAO] highlighted that abnormals are one of the largest drivers of schemes coming in above benchmark.

See RAAC remediation for the deadline and funding route, or whole-school refurbishment for an end-to-end refurb worked example.