RAAC remediation cost
Interim vs permanent remediation cost
Interim mitigation includes propping, scaffolding, temporary classrooms (decant), additional safety inspections and protective screens. These typically run £80-220k per affected block depending on size, access and how long mitigation must remain in place[RAAC]. Permanent solutions are either a like-for-like roof replacement or a full block rebuild.
The 2029 deadline
DfE expects RAAC to be permanently mitigated by 2029. The Department has been moving affected schools into the School Rebuilding Programme[SRP] rather than funding standalone RAAC replacement, on the basis that whole-school rebuild produces a building that meets Spec21[Spec21] and removes other condition risk in one go.
When to combine remediation with rebuild
Where the RAAC block forms a large share of GIFA, the rest of the building is in condition grade C or worse, and life-cycle modelling shows rebuild beating repair on 30-year cost, the case for rebuild is strong. NAO Jan 2025[NAO] framed the trade-off.
See abnormals and refurb vs rebuild.